CRS inspection of new broad gauge line between Chandod to Kevadiya

<p>The Newly constructed Broad Gauge line section from Chandod Station to Kevadiya Station (31.900 KM) will be inspected by the Commissioner Railway Safety, Western Circle on 14.01.2021 (Thursday) and 15.01.2021 (Friday). The Speed Trial of train at 130 KMPH on the newly constructed Railway line from Kevadiya Station to Chandod Station will be done between […]</p>

New Update
CRS inspection of new broad gauge line between Chandod to Kevadiya
Advertisment

The Newly constructed Broad Gauge line section from Chandod Station to Kevadiya Station (31.900 KM) will be inspected by the Commissioner Railway Safety, Western Circle on 14.01.2021 (Thursday) and 15.01.2021 (Friday).

The Speed Trial of train at 130 KMPH on the newly constructed Railway line from Kevadiya Station to Chandod Station will be done between 04:00 PM to 07:00 PM on 15.01.2021 (Friday).

The railway administration therefore advised people not try to cross the railway track or walk on the Railway Track anywhere else in this section.

Latest Stories